Saturday, 27 February 2010

Preparation for filming

We started off the day of filming at college as usual. we got in at 1, got all the equiptment out, eqiptment consisting of;

  1. 4x camera bag, each containing 1x Sony HD video camera 1x Battery 1x rode mic 1x HD DV tape 1x Senheiser headphones 1x mains power cable
  2. 4x Cram tshirts
  3. 1x Kodak digital camera
  4. 4x Tripod
  5. 1x battery charger

Once we had all our equiptment we made sure everything was in working order, this means making sure all the batteries are charged, the cameras are all set to HD and contained blank HDDV tapes and that the Mics are set up properly to record stereo audio.

We then left college and walked to The Junction.

No comments:

Post a Comment